ENGINEERING

Engineering from assessment to operation.

Coordinate site requirements, airflow, equipment selection, controls and maintenance throughout delivery.

Engineering from assessment to operation.

ENGINEERING PROCESS

Five connected steps.

Define what needs to be controlled, how the system will operate and how its performance will be verified.

01

Define the requirement

Identify source, workshop, outlet or boundary objectives, and ventilation or cleanliness requirements.

02

Assess the operating conditions

Review processes, materials, pollutants, temperature, humidity, airflow and existing measurements.

03

Evaluate airflow and capture

Check enclosure, hoods, air balance, pressure direction and fugitive releases.

04

Validate and select equipment

Match treatment mechanisms, air handling sections and control options to the actual load and operating conditions.

05

Deliver and verify

Define materials, resistance, interfaces, interlocks, maintenance access, measurements and acceptance criteria.

DELIVERY SUPPORT

Bring the system together.

01

Assessment

Review process conditions, pollutants and air handling requirements.

02

Equipment selection

Coordinate treatment units, air handling sections and operating limits.

03

System integration

Plan capture, ducting, interfaces, controls and maintenance space.

04

Commissioning support

Verify agreed operating modes, measurements and acceptance criteria.

VOCs RETROFIT

Validate one line. Then plan the rollout.

Assess source treatment, shorter duct runs and production-linked operation against a measured baseline.

  1. 01

    Site measurement

    Composition, concentration, airflow, temperature, humidity and production variations.

  2. 02

    Single-point trial

    Capture, outlet readings, energy use and consumable life.

  3. 03

    Phased retrofit

    Production interlocks, equipment layout, exhaust routing and safety controls.

  4. 04

    Operating review

    Track electricity, water, consumables and maintenance against the original baseline.

RAO-800 and JETA1000-2 can be assessed for source treatment. Suitability and savings depend on the actual pollutant load, operating hours and selected configuration.